META VALLEY District Unit Plan

– Access road review –

May 25. 2022 (Wed)

HAUD

Guidelines for Establishing District Unit Plans

Chapter 4 Criteria for Establishing Residential District Unit Plans

Section 2 Infrastructure

4-2-2 In principle, the access road shall be connected to the main road at the boundary of the planned area, The width of the access road shall be differentially planned according to the regional conditions and the size of the number of households used within the scope that does not interfere with traffic communication based on at least 8m.

Regulations on Housing Construction Standards, etc

Article 25(Entrance Road)

① The housing complex constructing the multi-family housing shall be in contact with the main road or have an access road from the main road to the relevant complex. In such cases, the width of the access road and the width of the access road shall be as shown in the following table.

 

Total number of households in housing estates

Width in contact with the main road or the width of the access road

300+ Generations Less than 500 households

8 meters or more

500+ Generations Less than 1,000 generations

12 meters or more

1,000+ generations Less than 2,000 households

15 meters or more

Over 2,000 generations

20 meters or more

Regulations on Housing Construction Standards, etc

③ The provisions of paragraph (1) may not apply where there are at least two access roads to a housing complex for the construction of multi-family housing and meet the standards in the following table: In such cases, a road with a width of 4 meters or more and less than 6 meters shall be deemed an access road only when the distance between the road and the road is within 200 meters.

Total number of households in housing estates

Of access roads over 4 meters wide, Sum of the width of the two access roads

300+ Generations Less than 500 households

12 meters or more

500+ Generations Less than 1,000 generations

16 meters or more

1,000+ generations Less than 2,000 households

20 meters or more

Over 2,000 generations

25 meters or more

 a key road

1. 「city and county It shall be a collection road or a local road under subparagraph 3 (c) or (d) of Article 9 of the Rules on the Determination, Structure, and Installation Standards of Planned Facilities

2. General National Roads, Metropolitan Do, Metropolitan City, or Local Roads under Article 10 of the Road Act

3. Other roads established pursuant to the relevant statutes and equivalent to those referred to in subparagraphs 1 and 2;

According to the Guidelines for the Establishment of District Unit Plans, access roads can be at least 8m, but according to the Regulations on Housing Construction Standards, etc., it is necessary to secure at least 8m → 12m or 15m from National Route 17

 Submission of road security plan at the stage of determining district unit plan

After determining the district unit plan, land compensation and implementation design for the road securing section are carried out when the housing construction project is approved